雅思机械

Yasi Machinery

4news -> Industry
Lock line machine is the book post through the lock line made of book core equipment. By the hitching page posting, buffer positioning, transmission, locking line, book counting and electrical control system. Is a thick book paperback and hardcover books after printing and binding of important machinery. Lock wire binding is mostly used to bind strong, durable books, such as encyclopedias, reference books, art books and bibles and so on. Here are the maintenance measures of the lock wire machine!
1, cleaning work
Cleaning is an important aspect of the maintenance of the lock wire machine, keep the machine appearance neat, machine belly clean, not only can improve the service life of the equipment, but also to find hidden accidents and equipment wear or damage, and can do timely maintenance. Lock wire machine
2, lubrication
(1) regular oil change. The new machine should be used 2 to 3 weeks after a thorough oil change, and then every 3 months to about half a year for an oil change. Each oil change should be thoroughly cleaned oil tank, oil pump, filter, check the oil circuit and parts.
(2) filling grease (grease), should be able to see the new oil and the old dirty oil all out of the friction surface is appropriate, so as to avoid the old oil in the fine friction debris and dirt.
(3) lock wire machine refueling should be carefully checked before the oil grade, quality, can not be mixed with different grades of oil refueling. Never mix gasoline, kerosene into the oil.
3、Check
(1) every shift check. When taking over each shift, you should check the records of handover to understand the operation of the machine in the previous shift.
(2) weekly inspection. General printing plant to set aside half a day a week to carry out detailed checks on the equipment. Weekly inspection may include the following: check the feeder chain, sprocket, universal shaft joints, key pins work; check the paper conveyor belt, belt clamps, tensioning wheels, tricky paper work; check whether the operation of the uncovered page is normal, etc..
(3) half-yearly inspection. Big check to the locking line machine to arrange enough time, including machine performance testing, general machine tank to replace the lubricant, wear parts to be replaced, electrical sensitivity checks, aging components to be replaced.
雅思机械APP
WhatsApp
WeChat